Electrical permits in Westminster, CO
Westminster issues its own building permits, electrical work included, through the eTRAKiT online portal. Here is what the City code requires, what it exempts and how the 2026 fee schedule works.
On this page
Who issues the permit
The City of Westminster Building Division. Its permitting is "fully paperless": you apply, submit plans, request inspections and get results through eTRAKiT. (City Building Division) The City notes that applications cannot be completed on a smartphone or tablet. (Apply for a Permit) The state's Electrical Board inspects only in areas without a local inspection program. (DORA permit information)
Which work needs a permit
Westminster Municipal Code § 11-9-3 requires a building permit before anyone installs, alters, repairs or replaces an electrical system, among other work. Its list of electrical work that does not need a permit is short (§ 11-9-3, Zoneomics compilation):
- Listed cord-and-plug connected temporary decorative lighting
- Reinstalling attachment plug receptacles, but not the outlets for them
- Replacing branch circuit overcurrent devices of the required capacity in the same location
- Wiring and equipment operating at less than 25 volts and not capable of supplying more than 50 watts
- Repair of broken or defective receptacles, switches or lamps
- Connecting approved portable equipment to approved permanently installed receptacles
Anything else, such as a new circuit, a panel change or a new outlet location, should be assumed to need a permit. The compilation we read carries a 2017 ordinance history line, so confirm with the Building Division if your job is borderline.
Which permit type
The City's Resources page lists the residential permit types (City Resources):
- Residential Counter, EV Charger: include the manufacturer's installation instructions.
- Residential Building, Electrical: the City's examples are an energy storage system installation or a main panel upgrade.
- Residential Interior: work inside the home that needs plans, such as a basement finish or interior remodel; remodel plans must show smoke and carbon monoxide alarm locations.
- Residential Exterior, Spa or Hot Tub: all work, including electrical, on one permit.
- Residential Solar: for photovoltaic systems only; an ESS, EV charger or main panel upgrade needs a separate permit.
- Shed or accessory structure: a permit is required for any accessory structure with electrical or plumbing, regardless of size.
Who can apply
The City says homeowners residing in the home can do the work and apply for the permits, and that a hired contractor must be signed on to the permit. (City Resources) Under state rules, a contractor must pull permits for its own work and may not work under a homeowner permit. (DORA permit information)
Which code applies
Westminster lists the National Electrical Code, 2026 Edition among its applicable design codes, alongside the 2021 International Codes. (City Building Division) Statewide, the Colorado State Electrical Board adopted the 2026 NEC effective August 1, 2026. (DORA bulletin)
Inspections
Inspections are requested through eTRAKiT. The City notes the inspection window is not guaranteed, the roster updates after 7:30 a.m. on weekdays, and the deadline to schedule for the next business day is 4 p.m. (City Building Division) The state's homeowner rule requires work to be inspected before it is covered by insulation or drywall, and again on completion. (DORA permit information)
What it costs
Fees come from the City's 2026 schedule and are based on the total valuation of the work. (Fee schedule) Example arithmetic:
| Line item | $1,800 job | $3,000 job | $8,000 job |
|---|---|---|---|
| Building permit fee (valuation table) | $53.95 | $71.15 | $130.65 |
| Plan review fee (65% of permit fee) | $35.07 | $46.25 | $84.92 |
| Electric permit trade fee (15% of permit fee) | $8.09 | $10.67 | $19.60 |
| Electric plan review trade fee (15% of plan review fee) | $5.26 | $6.94 | $12.74 |
| Estimated use tax (4.25% of 50% of valuation) | $38.25 | $63.75 | $170.00 |
| Total if every line applies | $140.62 | $198.76 | $417.91 |
The City's resident walk-through hours for residential permit reviews are Tuesdays 1 to 4:30 p.m. and Thursdays 9 a.m. to noon, but applications still go through eTRAKiT. (City Building Division)
Frequently asked questions
Do I need a permit to replace an outlet in Westminster?
Repairing a broken or defective receptacle, switch or lamp is on the City code's exempt list, as is reinstalling a plug receptacle. Adding a new outlet location is not on the list.
Does Westminster use the 2026 National Electrical Code?
Yes. The City's Building Division lists the National Electrical Code, 2026 Edition, and the State Electrical Board adopted it statewide effective August 1, 2026.
Can a homeowner pull an electrical permit in Westminster?
Yes, for work the homeowner personally performs on the home they live in. If you hire a contractor, the contractor must be signed on to the permit.
How do I apply for an electrical permit in Westminster?
Online through the City's eTRAKiT portal, on a computer rather than a phone or tablet.
Sources
Checked November 18, 2026.
- City of Westminster, Building Division
- City of Westminster, Apply for a Permit (eTRAKiT)
- Colorado DORA, Electrical Permit Information
- Westminster Municipal Code Title XI, Ch. 9, § 11-9-3 (Zoneomics compilation)
- City of Westminster, Building Resources
- Colorado DORA bulletin, 2026 National Electrical Code adoption
- City of Westminster, Building Division Fee Schedule (effective Jan. 1, 2026)